Hydro Power Station 2 x 19.5MVA, AVR upgrade – May 2011
Scope: Two static excitation systems were supplied for this project. Each system was designed with a single DECS400 and power bridge with rated excitation current up to 680Adc and forcing … Continue reading Hydro Power Station 2 x 19.5MVA, AVR upgrade – May 2011
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed